Check an EUDR geolocation file
Suppliers send plot coordinates as GeoJSON. Paste the file or load it. You see the usual errors before you file the due diligence statement: latitude and longitude swapped, too few decimals, open or crossing polygons, a point for a plot over 4 hectares, plots outside the country.
Rules from Regulation (EU) 2023/1115 and the EU information system guidance. Nothing is stored. Free.
Does EUDR apply to my product?
Ask with the HS code: the import rules check says whether EUDR or CBAM applies (furniture 9403, rubber 40, paper 48, cocoa 18, coffee 0901 and more) and from when. Importing from China? Wood furniture, plywood, paper and rubber goods are in scope; ask the factory for the plot file early.
For software and agents
POST /v1/eudr/geo-check with the GeoJSON as the body (or JSON {geojson, country, commodity}). Free, 30 files a minute. MCP tool eudr_geo_check. Free trial key · MCP setup
FAQ
When does EUDR start?
30 December 2026 for medium and large operators and traders, 30 June 2027 for micro and small ones. From then, cattle, cocoa, coffee, oil palm, rubber, soya and wood products, including furniture, paper and many rubber goods, need a due diligence statement before they enter the EU market.
What does the geolocation file need?
Every plot of land where the commodity was produced, as GeoJSON in WGS84 with at least 6 decimals: a point for plots up to 4 hectares, a polygon for larger plots. Cattle establishments may use a point.
What does this check not do?
It checks the file, not the forest. Whether a plot was deforested after 31 December 2020 needs satellite data and your own risk assessment.
Is my file stored?
No. It is checked in memory and discarded.